Skip to main content
RAYTRON Logo

How to Specify PV Ribbon

Start with the cell layout and ribbon function. Then define conductor size, solder coating, mechanical properties and spool format. Use a stringing trial to check feeding, peel strength and cell damage before setting the production specification.

Cell contactsCell interconnectString busbarModule connection
Functional positions only. Shape, joining area and connection hierarchy follow the actual assembly drawing.
On this page

Follow the cell and process definition

Fill in the input cells, then copy the table and paste it into your inquiry. Leave unknown items blank.

On narrow screens, scroll to see all columns.

StepInputs and checksYour input
1. Cell and current pathCell technology/metallization, contact layout, interconnect or busbar function and ribbon count
2. GeometryRound metal/finished diameter or flat width/thickness and tolerances; resistance and shading basis
3. CoatingIdentified solder alloy, thickness and coverage; flux and actual joining profile
4. Mechanical handlingCondition, yield/proof-stress method, elongation, camber and spool/feeding behavior
5. TrialReference cell/ribbon lots, settings, wetting, peel method, EL inspection and resistance
6. ReleaseModule tests for the changed bill of materials, acceptance, batch records and change control

Copy before opening inquiry.

Record the trial and order basis

Keep the drawing revision, sample identifiers, method, test conditions, acceptance limits and measured results together. Resolve open fields with the specification owner before comparing offers or releasing a changed construction.

RFQ Request Quote Discuss your specification WhatsApp
Request Quote WhatsApp